Datum, Benchmarks, and the Principle of Leveling in Surveying

Leveling (vertical control) determines elevations of points relative to a datum, or fixes points at desired elevations, using a horizontal line of sight to read a vertical staff, and the elevation difference follows from h_A + R_A = h_B + R_B. The datum must be an equipotential level surface (the geoid, realized as mean sea level) rather than a horizontal plane, because over large areas a horizontal plane departs from the earth's curvature, which would invert the true direction of water flow; the combined curvature and refraction correction is about 0.06735 D^2 (metres, D in km). It belongs to vertical-control surveying within plane and geodetic surveying.