Tom Resh
11 minutes
Highly Accelerated Stress Screening applies stresses between the specification and the HALT-discovered operating limit to every production unit, which is only safe once those limits are known and a safety-of-screen study shows the screen consumes negligible life. It is the node where the design-margin measurement pays off as a production control.