Parts and Materials Selection Control in Electronics
An approved parts and materials list, with qualification, finish and sourcing rules, controls failure mechanisms before a single board is built. It is where tin whisker risk, temperature rating, and counterfeit exposure are actually decided, and it is one of the design templates in the transition-to-production set.
This Concept is waiting for its first lesson!
An approved parts and materials list, with qualification, finish and sourcing rules, controls failure mechanisms before a single board is built. It is where tin whisker risk, temperature rating, and counterfeit exposure are actually decided, and it is one of the design templates in the transition-to-production set.
Are you a teacher? Sign in to start contributing.
Sign In