nptelhrd
58 minutes
Surveying requires a mathematically definable reference system since the earth's true surface and even the geoid (equipotential/level surface, approximated by mean sea level) cannot be expressed by equation; elevation (Z) is measured from the geoid while horizontal position (X, Y) is measured from a best-fit ellipsoid, with a flat-plane approximation valid for small-area engineering surveys since curvature effects are negligible. Surveying methodology follows core principles—reconnaissance, establishing a control network, working from whole to part, redundancy, and check lines—that govern the accuracy of any mapping exercise within the discipline of engineering/geomatic surveying.